Africa Steel & Tube Warehouse

VALUE

Confidential

Client

Africa Steel and Tube

Architect
Location

Alrode, Johannesburg

Launched

2017

Description

Xtentia was appointed as structural engineers to design a new 12 000 m2 steel frame warehouse for a new steel factory.  The warehouse structure had to support seven crawling cranes spread out across the factory, varying from 5 – 20 tonnes each.  The cranes imposed a multitude of load combinations on the structure, with varying crane operational schedules resulting in multiple load combinations.  A clear headroom of at least 12m was required, with clear spans of 25m in each of four bays.  A concrete retaining wall was required along two elevations that needed to be able to support a heavy 20 tonne / m2 surcharge load.